The List - Week 2

Here's our updated list...the things in red are what I added this week. I really wish Mark had a 4 day weekend like I did...we might have finished everything on the list!


Dining Room - ALMOST DONE!
Trim
Caulk and paint trim
Paint walls and ceiling
Scrub floor

Hallway - ALMOST DONE!
Trim
Caulk and paint trim
Paint walls and ceiling
Scrub floor
Paint doorjams


Little Room - ALMOST DONE!
Remove heat register
Redo window trim
Base trim
Caulk and paint trim
Scrub floor
Paint doorjam


Master Bedroom
Carpet to wood transition piece
Redo window trim
Install closet door knobs
Base trim
Caulk and paint trim
Paint doorjam


Master Bathroom
Seal tub grout
Redo window trim
Caulk sinks
Cabinet moulding
Base trim
Caulk and paint baseboard trim
Paint walls and ceiling
Glue mirrors to wall
Cabinet hardware
Caulk and paint window trim

Hallway Bathroom
Find vanity tile grout color
Grout vanity
Sink plumbing
Seal floor, counter, backsplash
Hang mirror
Cabinet trim
Base trim
Caulk and paint trim
Re-caulk shower
Install toilet (and get low flow conversion kit)
Cabinet hardware
Paint doorjam
Clean
Get toilet seat

Kitchen
Grout backsplash
Seal floor and backsplash
Cabinet moulding
Caulk and paint moulding
Long screws - upper cabinets
Cabinet shelves
Cabinet hardware
Bleach window and paint trim
Paint pantry doorjam
Transition piece to dining room
Scrub floor


All Around
Paint all new interior doors
Touch up paint everywhere
Scrub every single floor
Caulk all outlet and light switch plates