7.01.2010

The List

I made a list of everything we still have to do. I broke it down by room.  See?  There is a light!  The strike-throughed stuff is what we accomplished since I created the list Saturday morning...

Dining Room
Trim
Caulk and paint trim
Paint walls and ceiling

Hallway
Trim
Caulk and paint trim
Paint walls and ceiling

Little Room
Remove heat register
Redo window trim
Base trim
Caulk and paint trim

Master Bedroom
Carpet to wood transition piece
Redo window trim
Install closet door knobs
Base trim
Caulk and paint trim

Master Bathroom
Seal tub grout
Redo window trim
Caulk sinks
Cabinet moulding
Base trim
Caulk and paint trim
Paint walls and ceiling
Glue mirrors to wall
Cabinet hardware

Hallway Bathroom
Find vanity tile grout color
Grout vanity
Sink plumbing
Seal floor, counter, backsplash
Hang mirror
Cabinet trim
Base trim
Caulk and paint trim
Re-caulk shower
Install toilet (and get low flow conversion kit)
Cabinet hardware

Kitchen
Grout backsplash
Seal floor and backsplash
Cabinet moulding
Caulk and paint moulding
Long screws - upper cabinets
Cabinet shelves
Cabinet hardware
Bleach window and paint trim

All Around
Paint all new doors
Touch up paint everywhere

See? Hardly anything left!!
I'll do weekly updates of this list to show what we accomplish each week...wish us luck!!

No comments:

Post a Comment

Thoughts? Comments? We'd love to hear them!