Showing posts with label July weekly update. Show all posts
Showing posts with label July weekly update. Show all posts

7.06.2010

The List - Week 2

Here's our updated list...the things in red are what I added this week. I really wish Mark had a 4 day weekend like I did...we might have finished everything on the list!


Dining Room - ALMOST DONE!
Trim
Caulk and paint trim
Paint walls and ceiling
Scrub floor

Hallway - ALMOST DONE!
Trim
Caulk and paint trim
Paint walls and ceiling
Scrub floor
Paint doorjams


Little Room - ALMOST DONE!
Remove heat register
Redo window trim
Base trim
Caulk and paint trim
Scrub floor
Paint doorjam


Master Bedroom
Carpet to wood transition piece
Redo window trim
Install closet door knobs
Base trim
Caulk and paint trim
Paint doorjam


Master Bathroom
Seal tub grout
Redo window trim
Caulk sinks
Cabinet moulding
Base trim
Caulk and paint baseboard trim
Paint walls and ceiling
Glue mirrors to wall
Cabinet hardware
Caulk and paint window trim

Hallway Bathroom
Find vanity tile grout color
Grout vanity
Sink plumbing
Seal floor, counter, backsplash
Hang mirror
Cabinet trim
Base trim
Caulk and paint trim
Re-caulk shower
Install toilet (and get low flow conversion kit)
Cabinet hardware
Paint doorjam
Clean
Get toilet seat

Kitchen
Grout backsplash
Seal floor and backsplash
Cabinet moulding
Caulk and paint moulding
Long screws - upper cabinets
Cabinet shelves
Cabinet hardware
Bleach window and paint trim
Paint pantry doorjam
Transition piece to dining room
Scrub floor


All Around
Paint all new interior doors
Touch up paint everywhere
Scrub every single floor
Caulk all outlet and light switch plates

We're getting close!

7.01.2010

The List

I made a list of everything we still have to do. I broke it down by room.  See?  There is a light!  The strike-throughed stuff is what we accomplished since I created the list Saturday morning...

Dining Room
Trim
Caulk and paint trim
Paint walls and ceiling

Hallway
Trim
Caulk and paint trim
Paint walls and ceiling

Little Room
Remove heat register
Redo window trim
Base trim
Caulk and paint trim

Master Bedroom
Carpet to wood transition piece
Redo window trim
Install closet door knobs
Base trim
Caulk and paint trim

Master Bathroom
Seal tub grout
Redo window trim
Caulk sinks
Cabinet moulding
Base trim
Caulk and paint trim
Paint walls and ceiling
Glue mirrors to wall
Cabinet hardware

Hallway Bathroom
Find vanity tile grout color
Grout vanity
Sink plumbing
Seal floor, counter, backsplash
Hang mirror
Cabinet trim
Base trim
Caulk and paint trim
Re-caulk shower
Install toilet (and get low flow conversion kit)
Cabinet hardware

Kitchen
Grout backsplash
Seal floor and backsplash
Cabinet moulding
Caulk and paint moulding
Long screws - upper cabinets
Cabinet shelves
Cabinet hardware
Bleach window and paint trim

All Around
Paint all new doors
Touch up paint everywhere

See? Hardly anything left!!
I'll do weekly updates of this list to show what we accomplish each week...wish us luck!!