5.11.2010

Hallway Bathroom & Little Bedroom...Update


In the last few weeks, Mark was able to do a lot of work on the little room and the hall bathroom.   The little room is done except for pulling out the old boiler heat, patching parts of the wood floor, the cove base, and the window and door trim...basically just the finish work. (And, obviously, I have to clean the floor.)


{If the doors look yellow, it's because we haven't painted them yet.}

Our hallway bathroom also is a bit closer to being done.  We just have to install the flooring, vanity (when we get it), toilet, counter top, back splash, base trim, mirror, vanity light...then it'll be done! I know it sounds like a lot, but it's already 70% done, so it's all downhill from here.



A certain someone couldn't wait to use the shower, so he threw up the old shower curtain and used the shower like this.  I can wait!  

Oh, and this is currently serving as my dish-washing sink.  
Must. 
Have. 
Patience.  