1.07.2010

Day 2: More Master Bedroom

Mark has been a busy man this week.  The lull in business right now makes it the perfect time to sledgehammer through walls.  I have been working so I haven't been able to help much (I'm a weekend helper), but he has managed very well without me...and in FREEZING temperatures.  Well, not quite freezing, but as I type, it's 54 degrees in here because we had to disconnect the heat.  We have a boiler and very attractive (um...not) pipes running along the floorboards of every room, many of which have been ripped out in the remodel process.  We do plan to put a very nice high efficiency heat pump in soon (March).

Marked worked on more demo and more reconstruction in the master bedroom.



Here is a look at the new entrance to the bedroom from the inside of the wood room.  It's now the doorway to the master bedroom (see the header at the top of the picture?).  In the center of the picture is the new doorway to the master bedroom closet. Try to look for the other header and that's it.



Mark also framed in the now OLD master bedroom closet.  We haven't punched a hole in the other wall yet to make the new closet doorway. Soon, very soon.



Here's another shot of our new closet from an angle. The wall in the left in the picture is coming down...but not quite yet.



Sorry for the awesome crooked picture.  This is a cutie little linen closet we were able to make...it is on your left across from the new master bedroom closet as you walk in through the new bedroom entrance. Make sense?



And, last but not least, the wall to the NEW master bathroom is up!!  This I am very excited about!

I am getting to the point where I am overlooking the mess (I'll tell you what, it's a lot to overlook!) and starting to see what this might all come together to look like soon. I hope it's soon!  It's exciting...and stressful...and fun, all rolled up into one very messy package.  

And we're only just getting started!

No comments:

Post a Comment

Thoughts? Comments? We'd love to hear them!